Critical Cooling Infrastructure

Every site has a best cooling approach. We design it, test it and build it.

Cooling is a business decision. We engineer the best one for your site.

600+ MW
Designed, deployed & operating worldwide
Five nines
Uptime, sustained for years
Edge → GW
From a few racks to campus scale

Operated for sovereign-backed and institutional operators

Technology-agnostic

Where the heat goes depends on the site.

GPU racks
150–300 kW
Thermocline
Dry cooler
+ adiabatic
Ambient air

Dry-primary with adiabatic assist. Full performance through extreme ambient, with minimal water.

What we do

Five steps. One accountable team.

01
Assess
Site, climate, water, grid, and compute.
02
Propose
The best approach, weighed across every technology.
03
Prove
Thermal modeling, validated on our own test rigs.
04
Deliver
Built through proven vendors and factories.
05
Run
One control system over the whole site.
Monitoring & control

Every component, one system.

Thermocline OS Predict · Protect · Optimize · Curtail
Chillers Dry coolers Pumps CDUs Valves Sensors

Custom hardware, firmware, and software. Vendor-neutral by design.

How we fit

The right partner in the room.

The cooling specialist between operators, MEP firms, and equipment vendors.

Operators MEP Firms Vendors
Thermocline
Start with your site

Tell us where you're building. We'll tell you the best way to cool it.

Send the site. We come back with a defensible read.